Case Studies

An inclusive office for the Lesotho National Federation of Organizations of the Disabled

Background

The Lesotho National Federation of Organizations of the Disabled (LNFOD) is an umbrella body of organizations dealing with disability in Lesotho. LNFOD advocates for, promotes, and defends the rights of people with disabilities and their families through provision of training, material and emotional support, and by representing their needs to government, development partners and the wider community. 

The Problem

The building in which LNFOD used as their office was not accessible and inclusive of people living with disabilities. There were no ramps, sliding doors, or rails in the toilets. There were no pavements on the outside of the building making it difficult for people who use wheelchairs to access the building. There were also no guiding blocks to assist blind people and signage for general guidance and warnings. The building had poor ventilation and lacked thermal insulation. In essence, the office did not allow for the organization to employ people with disabilities nor fully carry out services for people with disabilities because of  lack of accessibility.

The Solution

rise built a new all inclusive office in Naleli, Maseru the capital city of Lesotho. This building is the first one of its kind in the country catering completely for people with different disabilities. It has a ramp for easy access for people with physical disabilities, the doors are wide to allow  wheelchair access, there are rails in the bathroom, the walls are made of textured tiles for guidance for people with blindness or eye sight impairment. The building has insulation in the ceiling as well as a cavity wall for insulation which makes it warm in winter and cool in summer. It is also designed such that there is a separate entrance for the boardroom and toilets allowing LNFOD to rent out the boardroom to external entities as an income generating source because social enterprise is the heart of rise.

Methodology

With the support of funds from Sedlak GmbH and Brotfür die Welt, the rise in loco cohort of 2020 designed and constructed this building. in loco is rise’s learning by doing program where 

Young Basotho graduates from the design, architecture and built environment fields come together as a fellowship and learn practical skills. This way, graduates gained practical skills while the LNFOD community gained an inclusive office space.

Challenges

The site available for the building was very small, as was the budget for this project. Moreover this building was constructed during the Covid-19 pandemic, movement restrictions due to the pandemic restricted a lot of activities and decreased morale on site. People on site had to work with each other but still maintain Covid-19 protocol which was new and uncomfortable. Construction materials prices kept increasing due to high transport costs and restricted movements which further challenged an already budget-restricted project. Hardware stores would often run out of stock, which challenged progress on site. The International partners were not able to visit the project.

The Impact

LNFOD is a national umbrella body of organizations of persons with disabilities and therefore works for an estimated 56 000 people in Lesotho according to census (2016). LNFOD now employs more than 10 people with different disabilities and can provide even more services because of their fully inclusive new headquarters office building.

Testimonials

Nkhasi Sefuthi – Director of LNFOD

We now have accessible toilets and ramps that make the office accessible for all people with disabilities including those using wheelchairs. We are now able to conduct our work efficiently even without the disturbances we used to have in our previous working space.

SEDLAK GmbH and Diakonie/Brot für die Welt – Sponsors of the project

We are proud to have supported the first accessible and inclusive office building in Lesotho. The construction of the LNFOD offices in Naleli is a milestone for disability organizations in Lesotho and will hopefully serve as a role model for other accessible buildings throughout the country.” 

READ MORE
rise News

rise’s work on Water, Sanitation & Hygiene (WASH)

rise‘s work on Water, Sanitation & Hygiene (WASH)

“Growing up in a clean and safe environment is every child’s right. Access to clean water, basic toilets, and good hygiene practices not only keeps children thriving, but also gives them a healthier start in life.” – Unicef

Lack of sanitation can be a barrier to individual prosperity and sustainable development. When children, especially girls, cannot access private and decent sanitation facilities in their schools and learning environments, the right to education is threatened. Poor sanitation puts children at risk of childhood diseases and malnutrition that can impact their overall development, learning and, later in life, economic opportunities. According to UNICEF, as of 2015, nearly one in ten children in Lesotho dies before reaching their fifth birthday. Too many of these deaths are due to the effects of unclean water and inadequate sanitation and hygiene, which increases a child’s vulnerability to disease and infection. Most of Lesotho’s ten districts report a high percentage of households using unprotected water sources, and about 20% still need access to improved sanitation facilities. That is why we have partnered with various organizations and entities to address this urgent challenge. 

What rise has achieved so far…

Toilets for a Primary School in Lithabaneng village

Watch video of the launch

Ever since the existence of Seboka Primary School, over 600 learners yearly have endured poor sanitation due to a lack of healthy sanitation facilities and no running water anywhere on the school site. We are so proud of our in loco pioneers xyz collaborative for building new toilets for the learners and staff and Mokhethea Civils and Contactors for constructing the percolation system, as part of our 5 Hub Schools project thanks to the support of a not for profit organization called Action Ireland Trust (AIT) in collaboration with the Ministry of Education and Training of Lesotho.

Boreholes and rainwater harvesting for 5 Hub schools

Our in loco Pioneers PRO Construction successfully constructed rainwater harvesting systems in 2 schools with the help of sponsorship from the British High Commission in Lesotho and AIT. The boreholes, together with the rainwater harvesting systems now provide a regular flow of clean running water to the schools, facilitating general good hygiene and frequent handwashing amongst learners and the schools’ community – an essential healthy habit in these Covid-19 ridden times. This access to running water also makes food preparation in the schools much easier, provides much needed water in the food gardens constructed by Green Yards, another in loco Pioneer company while promoting food security and food hygiene, and further supplies constant water circulation in the newly built toilets. 

Why food gardens? You may ask. School lunch is the only meal that many of the learners in these schools get each day and therefore being able to grow their own nutritious food is vital for the learners’ feeding program and overall health & nutrition hence the construction of these food gardens. The schools are also able to sell excess produce to raise funds towards their operational costs.

No more outdoor cooking for another school in Lithabaneng village

The food preparation of over 600 learners was done in the outdoor area of Leqele Primary School. It is so amazing to have our in loco Pioneers Presto Construction Company build a new kitchen for this school also with clean water supply. It is integral that food be prepared, handled and served where there is access to running water.

Hand Wash stations for towns, hospitals, schools and villages in Lesotho during 1st wave of Covid-19

Watch more on this project

To curb the spread of the Coronavirus, we built handwash stations in all 5 schools in the Lithabaneng area which promoted hygiene and the safe handling of food. On the same mission, xyz collaborative built 105 more hand wash stations which were installed in all 10 districts of Lesotho in various health clinics, hospitals, child care facilities as well as busy town areas in partnership with UNDP, UNICEF and the Ministry of Health.. We built 10 more for a semi-rural community called Motimposo to lessen the number of communities that did not have access to running water and were thus at the highest risk of contracting the virus.

Safely managed water, sanitation, and hygiene (WASH) services are an essential part of preventing and protecting human health especially during infectious disease outbreaks, including the current Covid-19 pandemic. Our mission is to ensure that young people exist in environments that allow them to develop so they can one day join the fight against poverty in Lesotho and the Subsaharan African region at large.

We call on you to help make a difference with us! 

READ MORE
News

rise’s work on Universal Design 

 

rise’s work on Universal Design 

We often say that we are inclusive of all communities, or that we are restructuring society to be understanding and empathic of all, especially the marginalized. But to which extent? The lack of inclusivity in urban planning does not only separate us by weaknesses and strengths, but it deprives us of some of the joys of the environment like urban spaces, access to green spaces and even essential services like public transport.

It is pivotal for professionals in the built environment to prioritize the promotion and protection of the rights of people with disabilities particularly in urban design. With the hope that a potential exists for the improvement of buildings and thus facility access for people with disabilities in Lesotho, rise embarked on a project that would shed light on the existing issue of “lack of inclusivity in the urban design of Lesotho”. According to a study by the Lesotho National Federation of Organizations of the Disabled (LNFOD), people with disabilities are constantly faced with the challenge of not having equal access to facilities like banks and hotels and to services like public transportation as the built environment does not cater for wheelchair access and other limited mobility needs. 

The aims of this project were to facilitate an interface which promotes that everyone gains equal access to services and facilities; to educate the general community on the need for inclusivity in urban design; to increase awareness within the built environment sector on the need for inclusivity in design and construction and to engage policy makers in the discussion on inclusivity in the urban planning of Lesotho. Empathy is key here, the feeling of belonging rather than feeling excluded. Inclusivity of design is achievable. The goal of inclusive design is to offer the same access for all users, whether with special needs, disabilities or neither of these.

……Empathy is key here

 

 

What rise has achieved on universal design so far…  

 

A panel discussion with policy makers 

Made possible by the British High Commission

rise hosted a photo exhibit and panel discussion on inclusive design where policy makers engaged in a discussion around the need for reforms on Building Codes for inclusive design in both private and public sectors. A voting poll was set up for the general public to vote on the matters that mean the most to them regarding the infrastructure and accessibility of Maseru city. 

Key stakeholders working in the built environment made pledges on how they are going to commit to improving the existing situation of lack of inclusivity in the urban planning of Lesotho. WATCH VIDEO OF PANEL DISCUSSION

A webinar to create awareness on Inclusive design in Lesotho & internationally

WATCH VIDEO OF WEBINAR

After the panel discussion rise hosted a webinar on Inclusive design in Lesotho and internationally where professionals engaged, educated and spoke on the need for universal design globally and locally.

Radio shows to create awareness on the need for universal design

 

rise hosted 4 radio shows in partnership with SkyAlpha, aimed at increasing awareness of the need for inclusivity in the urban planning of Lesotho.

An inclusive building for people living with disabilities

 

Through in locorise built an all inclusive design building for the Lesotho National Federation of Organizations of the Disabled, allowing them to finally employ people with physical disabilities.

 

A panel discussion with key stakeholders for action planning

 

Universal Design for Maseru City Roundtable was hosted on March 2nd 2022 by the Ministry of Local Government and Chieftainship, facilitated by rise and funded by the British High Commission in Lesotho with a focal thematic area around Universal Design including :

1. Regulatory & Legislative Building Codes for Inclusive Design 

2. Design & Planning Practices 

3. Action planning and Next Steps needed 

Our work on Universal Design does not end here, watch out for more on our social media platforms, engage with us on this topic and lend your hand wherever you can because if you want to go fast you go alone. But if you want to go far you go together. Let’s go together!

 

READ MORE